Great Model Railroads Vol. 55
Jerry Macri's Pennsylvania Railroad is huge, 4300 square feet of big time four track mainline! In fact this may be the largest home layout ever built! This HO layout runs from Chicago to New York and can handle more than 1200 pieces of rolling stock. It takes a train 25 minutes to run across the layout. Along the line there is a massive steel mill and a 30 foot deep Horseshoe Curve-- two signature elements of Western Pennsylvania. The Pennsy began in 1990 in a 2800 square foot basement. But then Jerry decided to add more layout space and more house and even a patio above. So the layout is now 3 inter-connected rooms with about 50% of the scenery completed. There are more than 20,000 trees on the layout. This is a prototype-based HO layout with a lot of freelanced scenic elements. Creating realistic and evocative scenes is Jerry's favorite part of the hobby because this helps him remember special times and places from his youth in the late 50s and early 60s.
Top Cast
Allen Keller
as Himself - Host
Jerry Macri
as Himself
Info
More Like This

1917, The Train from Hell
2019 • Movie

The Canadian Rockies by Rail
2016 • Movie
Oceľová cesta
1950 • Movie
Das Zugunglück von Radevormwald – Leben mit der Katastrophe
2021 • Movie

TGV Paris-Marseille, ligne de tous les défis
2022 • Movie

100 Years of British Trains
2007 • Movie

Ascq 44
2025 • Movie

Riding the Highline
2015 • Movie

Railroaders
1958 • Movie
Trať družby
1952 • Movie

A Great Railroad at Work
1942 • Movie

Desert Empire
1948 • Movie

Mainline U.S.A.
1957 • Movie

Safe Roads
1935 • Movie

The Modern Coal Burning Steam Locomotive
1942 • Movie